Write an AI pilot you can actually judge.
A pilot that cannot fail has not been designed.
Most AI pilots end in an argument about the result rather than a decision, because the baseline, the target, the sample and the definition of a wrong answer were all settled afterwards. This writes the charter first, and reports the day each review actually falls on rather than the day its label claims.
- For
- Whoever owns a pilot that has to reach a decision
- Time
- About 12 minutes
- You need
- The baseline you measure today, the target you are willing to state, and three review dates
- You get
- A printable pilot charter: baseline, acceptance criteria, measurement schedule, rollback triggers and the decision questions
The tool
Write the plan.
You supply the target. The tool makes it explicit and testable, and says nothing about whether you will reach it.
There is no readiness score here, and no prediction. You supply the target; the tool makes it explicit, measurable and falsifiable, and writes down what would stop the pilot.
The input controls on this page need JavaScript. Everything else works without it: the worked example below is computed when the page is built, and the method, tables, limits and questions are plain text.
What you enter stays in this browser. Nothing is sent to KyperX, nothing is written to browser storage, and the copy, CSV and print are assembled from what is already on screen. Reloading clears it.
Method and limits
How it works, and what it does not do.
Open what you need. None of it is required to use the tool.
A worked example, computed when this page was built
A neutral synthetic pilot: assisted triage of inbound service requests. The figures are invented round numbers and are not drawn from any engagement or benchmark.
- Use case — Assisted triage of inbound service requests
- Baseline process — Two coordinators read each inbound request, assign a category and a priority, and route it. Roughly 240 requests a day, with a backlog cleared every Monday.
- Primary outcome — Median time from receipt to correct routing
- Current value — 260
- Unit — minutes
- Improvement direction — Lower is better
- Target value — 120
- Measurement source — System timestamps from the service desk
- Sample method — Every instance in the period
- Sample size per review period — 120 instances
- Quality and error criteria — A routing is correct if the receiving team accepts it without reassignment. A wrong category on an accepted routing is a minor error; a missed urgent request is a major error.
- Human review step — Every output reviewed before it takes effect
- Review routing limit — 25 % of instances
- Adoption measure — Share of eligible instances that went through the system
- Adoption target — 70 %
- Excluded cases — Requests from the two regulated business units, anything raised by phone, and any request already escalated.
- Incident trigger — Any urgent request routed away from the on-call team, or any request containing personal information routed to an external address.
- Rollback condition — Two major errors in any week, or a single incident of the second kind, returns all routing to the coordinators within the same business day.
- Pilot owner — Service operations lead
- Start date — 2026-10-13
- First review — 2026-11-12
- Second review — 2026-12-12
- Decision date — 2027-01-11
- Required change
- -140.00
- target less current value, in your unit
- Required change
- -53.8%
- the same change as a percentage of the current value
- Target direction
- Consistent with the direction you chose
- whether the target moves the metric the way you said was better
- Total instances reviewed
- 360
- sample size per review × review periods
| Figure | Value | What it is |
|---|---|---|
| Required change | -140.00 | target less current value, in your unit |
| Required change | -53.8% | the same change as a percentage of the current value |
| Target direction | Consistent with the direction you chose | whether the target moves the metric the way you said was better |
| Decision, day | 90 days from the start | measured from the start date, not from the label |
| Second review, day | 60 days from the start | measured from the start date, not from the label |
| First review, day | 30 days from the start | measured from the start date, not from the label |
| Dated reviews | 3 | reviews with a usable date |
| Total instances reviewed | 360 | sample size per review × review periods |
| Pilot duration | 90 days | start to the final decision date |
Checks this example triggers
Nothing in this example is missing or inconsistent.
Decision questions at the final review
- Did the primary outcome reach the target you set, measured the way you said it would be?
- Was the quality criterion met on the sample, and were the major errors of a kind you can live with?
- Did the proportion routed to a person stay within your limit?
- Did the people doing the work actually use it, against your adoption target?
- Did any incident trigger fire, and was the response what the plan said?
- What did the excluded cases turn out to be, and does including them change the case?
- Is the running cost what the business case assumed?
- Continue, change the scope, or stop: which, and who signs that?
Assumptions register
Every figure below is one the reader supplied, not one this page chose. They travel with the result so a reviewer can argue with them.
- Improvement direction — Lower is better
- Measurement source — System timestamps from the service desk
- Sample method — Every instance in the period
- Sample size per review period — 120 instances
- Human review step — Every output reviewed before it takes effect
- Review routing limit — 25 % of instances
- Adoption measure — Share of eligible instances that went through the system
- Adoption target — 70 %
- Excluded cases — Requests from the two regulated business units, anything raised by phone, and any request already escalated.
How it works, rule by rule
Almost everything here is transcription, deliberately. The value is in having stated it before the pilot, not in the arithmetic.
| Figure | How it is calculated |
|---|---|
| Required change | target value − current value, in the unit you stated |
| Required change, per cent | (target − current) ÷ |current| × 100, undefined where the current value is zero |
| Target direction | checked against the improvement direction you chose; a target on the wrong side of the baseline is reported as such rather than corrected |
| Pilot duration | days from the start date to the final decision date |
| Review day offsets | days from the start date to each review date |
| Total instances reviewed | sample size per review period × the number of dated reviews |
| Review timing, checked | each review is compared with the interval its label describes; a difference of more than 10 days, or a gap under 7 days from the start or the previous review, is reported |
The rules the tool applies
It checks the target against the direction. If you say lower is better and enter a target above the baseline, it says so rather than silently reinterpreting it. That is the single most common transcription error in a pilot plan.
It counts the sample. Sample size per review multiplied by the number of dated reviews, so the total evidence base is visible before anyone commits to reviewing it. A plan that requires 400 manual reviews a month from a team of two will not happen, and it is better to find that out now.
It flags what is missing. An unestablished measurement source, an unestablished sample method, a convenience sample on a material decision, no human review, no adoption measure, no quality criteria, no rollback condition, no declared exclusions, dates out of order, or a sample size of zero. Each flag is a restatement of something you left blank or selected, and nothing else.
It does not score readiness and does not predict success. There is no percentage, no maturity level and no traffic light, because any of those would require a benchmark population we do not have.
Every input, and how to use it
| Input | Unit | What it means |
|---|---|---|
| Use case | — | One line. It becomes the title of the charter. |
| Baseline process | — | How the work is done today, in enough detail that a reader could observe it. |
| Primary outcome | — | One outcome. A pilot with four primary outcomes has none. |
| Current value | — | The baseline, measured rather than estimated where possible. |
| Unit | — | State it explicitly. Half the disputes about pilot results are unit disputes. |
| Improvement direction | — | |
| Target value | — | Your target, in the same unit. The tool does not suggest one. |
| Measurement source | — | |
| Sample method | — | |
| Sample size per review period | instances | How many instances each review looks at. A number you can actually resource. |
| Quality and error criteria | — | Define correct, minor error and major error before the pilot, not after the first argument about a result. |
| Human review step | — | |
| Review routing limit | % of instances | The most you are willing to route to a person and still call the pilot a success. |
| Adoption measure | — | |
| Adoption target | % | Your figure. A pilot with high accuracy and low adoption has failed, and it is the failure people forget to measure. |
| Excluded cases | — | What is deliberately out of scope. Excluded cases are not failures, and undeclared exclusions invalidate the result. |
| Incident trigger | — | What counts as an incident, written so that a person on shift can recognise one. |
| Rollback condition | — | The condition and the action, including who is allowed to invoke it without asking. |
| Pilot owner | — | The role accountable for the decision at the end, not the person running the standup. |
| Start date | — | |
| First review | — | Usually about 30 days after the start. The plan reports the day it actually falls on, and says so when the two disagree. |
| Second review | — | Usually about 60 days after the start. The plan reports the day it actually falls on, and says so when the two disagree. |
| Decision date | — | Usually about 90 days after the start. The plan reports the day it actually falls on, and says so when the two disagree. |
The four ways a pilot becomes unjudgeable
- No baseline, or a baseline measured differently afterwards. The cure is to record the baseline from the same source, by the same method, before anything changes. If the baseline has to be constructed, that work belongs before the pilot rather than inside it.
- No agreed definition of a wrong answer. Without a written distinction between correct, minor error and major error, the review becomes a negotiation. Write it before the first result arrives.
- Everything routed to a person. Accuracy looks excellent and nobody saves any time. This is why the plan carries a limit on the proportion routed for review, measured rather than assumed.
- High accuracy, low adoption. The system works and the team quietly keeps using the old process. Adoption is a first-class acceptance criterion here, not a footnote, and it is the one most often left unmeasured.
What each review is for
30 days
- Is the measurement actually working, from the source you named?
- Is the exception log being filled in?
- Any incident triggers fired, and did the response match the plan?
- Early quality and adoption signal, not a verdict.
60 and 90 days
- Trend against the target, on the declared sample.
- What the excluded cases turned out to be.
- Whether the review-routing limit is holding.
- At 90 days: continue, change the scope, or stop — and who signs that.
What this does not do
- It does not judge whether your target is achievable. You set it. The tool makes it explicit and checks only that it points the way you said was better.
- It does not choose a sample size for you. Sample sizing for a defensible statistical claim depends on the variance of the measure and the effect you need to detect, which are not inputs here. Treat the figure you enter as a resourcing decision, and get statistical advice where the decision is material.
- It does not validate the measurement source. A system timestamp that records the wrong event is worse than a manual observation.
- It is not an impact or privacy assessment. Where a pilot affects people's entitlements, employment, safety or rights, a separate assessment is usually required and this is not it.
- It does not model cost. The business case is the companion tool, and a pilot that hits its accuracy target while the running cost exceeds the benefit has still failed.
This page is general information and a starting point for your own pilot documentation. It is not legal, privacy, safety, clinical, employment or statistical advice. Where a pilot could affect a person's rights, safety, money, employment or entitlements, involve the people in your organisation accountable for those obligations before it starts, and obtain qualified advice where the position is unclear.
Terms used here
- Baseline — the current value of the primary outcome, measured from the source you will use afterwards. Not an estimate of it, where that can be avoided.
- Primary outcome — the one measure the pilot is judged on. Additional measures are useful; additional primary measures mean there is no decision rule.
- Acceptance criterion — a statement that can be true or false at the review, written before the review.
- Review routing limit — the maximum share of instances that may be sent to a person while the pilot still counts as a success.
- Exception — an instance the system could not handle correctly, logged so the pattern can be seen rather than remembered.
- Rollback condition — the circumstance in which the old process resumes, and who may invoke it without asking permission.
Common questions
How do you measure the success of an AI pilot?
Against one primary outcome, with a baseline recorded from the same source before anything changes, a target you stated in advance, a declared sample method, and a written definition of a correct and an incorrect result. Add two criteria most plans omit: the proportion of work still routed to a person, and whether the team actually used the system. A pilot judged on anything decided after the results arrive is not a pilot.
How long should an AI pilot run?
Long enough to see the cases the first fortnight hides, which in practice usually means a month of operation plus two further review points. The 30, 60 and 90-day structure here is a common default rather than a rule; what matters is that the dates and what each review assesses are fixed before the start.
What should the acceptance criteria be?
Statements that can be false. An accuracy threshold on a held-out sample of your own material; a ceiling on the proportion routed for human review; an adoption figure; and confirmation that the human review step operated as described. Anything phrased as "works well" cannot be tested.
Why does the plan insist on a rollback condition?
Because without one a pilot becomes a deployment by default: the trial period ends, nobody decides anything, and the system is in production. A rollback condition names the circumstance, the action and the person allowed to invoke it without seeking approval.
Does the tool tell me whether we are ready for AI?
No, and deliberately. Readiness scores compare you with a population, and publishing a benchmark we cannot evidence would be inventing data. This tool makes your own plan explicit and shows what is missing from it, which is the part that changes the outcome.
Is what I type here stored or sent anywhere?
No. It stays in this browser tab, nothing is written to browser storage, and the print and CSV outputs are assembled from what is already on the page. Reloading clears it, so export before you leave.
- Estimate annual benefit and paybackWork out what one AI use case is worth, keeping hours released and money saved as separate claims.
- Build an AI register and see what needs a decisionTurn what people tell you into a register, with the gaps named rather than guessed.
- Generate the requirements and questions for an AI purchaseSeparate what a supplier must satisfy from what you would prefer, before anyone writes a response.